Construction scheduling, cost optimization, and management : a new model based on neurocomputing and object technologies. / Hojjat Adeli [and] Asim Karim.
Material type:
TextPublication details: London : Spon Press, 2001. Description: xvi, 320 p. : ill. ; 23 cmISBN: 041524417XSubject(s): Building -- Cost control | Construction industry -- Management | Production schedulingLOC classification: TH438.4 A34 2001 Other classification: TH438.4 ADE
| Item type | Current library | Call number | Status | Notes | Date due | Barcode |
|---|---|---|---|---|---|---|
General Collection
|
Universiti Teknologi Brunei Library | TH438.4 ADE c.1 (Browse shelf(Opens below)) | Available | Reg. no. 30482_UTB | 813323 |
Includes bibliogrpahical references and index.
General Collection
There are no comments on this title.