000 00883nam a22002657a 4500
001 194320
003 MOEB
005 20221223072555.0
008 830101s1983 enka g 001 0 eng d
020 _a0091500915
035 _a(SITECODE)OLD26499
040 _aUniversiti Teknologi Brunei
084 _aTH437 WAI
100 1 _aWainwright, W. Howard
_q(Walter Howard),
_d1926-
245 1 0 _aVariation and final account procedure.
_bW. Howard Wainwright and A.A.B. Wood.
_h[Books].
250 _a4th ed.
260 _aLondon :
_bHutchinson,
_c1983.
300 _a179p. :
_bill. ;
_c24cm.
500 _aIncludes index.
650 0 _aBuilding
_xEstimates.
650 0 _aBuildings
_vSpecifications.
653 _aBuildings
_aConstruction
_aContracts
_aCalculations
_aEffects of cost variation
700 1 _aWood, A. A. B.
_q(Adrian A. B.)
998 _eBook
999 _c11965
_d11965
911 _a1
_badmin admin
912 _a1
_badmin admin